ASHES (Ark Society Home Empowerment Strategy) Project

15

Ark Society Home Empowerment Strategy (Ashes) is a project that was designed to improve the Office premises of the FSAs and Ark by ensuring that Ark and the FSAs would be housed in modern buildings that would be owned by the members.
Ashes was designed to be implemented in phases. Phase one entailed acquisition of plots by the FSAs and Ark. Phase two would involve the construction of the ground floors that would be occupied by the FSAs and Ark and phase three would involve a continuation of the upper floors of the occupied buildings.
So far Ark Development Initiative, Ark Wongonyi FSA, Ark Buguta FSA and Ark Werugha FSAs have finalized phases one and two.
Ark Mbololo FSA, Ark Lango Baya FSA, Ark Bahari FSA, Ark Taveta FSA and Ark Mghambonyi FSA have plots that they plan to commence construction in the near future. The other FSAs are all in the plan of acquiring land possibly before the end of the financial year. A completion of this project shall provide a solid asset base that shall enable Ark to attract strategic partners to invest in joint formal projects in Value Addition like milk processing, banana processing and bulking of grains. Such an asset base should enable ark to attract long-term financing to set up small industries that specialize in value addition for the members’ produce.

Ark Development Initiative

Ark is currently housed in its own building.

Once completed, ARK Centre (Safina) (A Six storey modern complex) shall house Ark offices, Ark Vosa FSA, a Supermarket (or large scale retail outlet equivalent) and shall have lots of lettable spaces. It shall have adequate and secure parking, direct access to the main road, reliable electricity supply (including a stand by generator and solar) a two-way lift among other facilities. The building gives a very good view of the SGR line and Sagala Hill. It is located at Birikani Village, the fastest growing neighbourhood in Voi.
The project is expected to cost more than Kenya Shillings Two Hundred Million.

Current progress of ARK Centre (Safina)
Underground water tank for Above: This shall be
150,000 litres of water
Bio digester – Capacity to support 150 people.
Old ARK WONGONYI FSA Building, (This is where the dream began.)
Ark Wongonyi FSA -Proposed building
Ark Wongonyi FSA Current Progress. The Ground floor was fully financed by the FSA and members and completed at a cost of Kenya Shillings Fourteen Million Five Hundred Twenty-Five Thousand Eight Hundred and Twenty Three Only (14,528,823).
Members being served in the newly completed banking hall.
The initial building that was built to start off Buguta FSA in 1997. People thought it was a “Butchery”
Ark Buguta FSA Current Progress (Ground floor was fully financed by the members and completed at a cost of Kenya Shillings Eight Million, Three Hundred Thirty Six thousand One Hundred Ninety Nine Only (8,336,199)
Ark Buguta FSA Completed Ground Floor.
Inside Ark Werugha FSA Building (This is where the dream began).
Ark Werugha FSA – Proposed building
Ark Werugha FSA current progress.
Ark Werugha FSA Current Progress (Ground floor was fully financed by the FSA and members completed at a cost of Kenya Shillings Eleven Million Four Hundred Seventy-Nine Thousand Three Hundred Thirty-Nine Only (11,479,339).
Newly purchased tractor and ripper on the right to help in championing food security